1.設(shè)備概述
1.1光學(xué)部份 Optical Part:
采用專業(yè)微分干涉光學(xué)頭;Professional differential interference optical head is used.
多層鍍膜技術(shù)保證清晰度;Multilayer coating technology ensures clarity.
明光路及高倍率物鏡觀察;Light path and high power objective lens observation;
配有LED表面光及底部光;It is equipped with LED surface light and bottom light.
1.2主機(jī)部份Host part:
由花崗巖制成的測量平臺和大理石龍門式結(jié)構(gòu),大理石與底座之間有四個防震墊,達(dá)到防震效果。高精度手工打磨導(dǎo)軌,承載工件重量:50 Kg. The measuring platform made of granite and the marble gantry structure have four cushions between the marble and the base to achieve the anti-seismic effect. High precision manual grinding guide rail, maximum load-bearing workpiece weight: 50 Kg.t
Measuring Range/測量范圍:
X-axis: 200 mm
Y-axis: 100 mm
Z-axis: 200 mm
Z軸最小移動精度為0.1μm。
整機(jī)運行無需水、氣,要求220V電壓。
2.硬件描述
Instrument Main Body儀器機(jī)身
Marble base, column, work table 大理石底座/立柱/工作臺面(平整度≤10μm)
Transmisson System傳動系統(tǒng)
無牙螺母+光桿傳動
Sport Guide運動導(dǎo)軌
精密級V型導(dǎo)軌
Optical calibrator光學(xué)校正片(用來校正精度)
Special custom 專用定制
Monitor顯示器
21.5 " liquid crystal display 21.5〞 液晶顯示器
Keyboard / mouse鍵盤/鼠標(biāo)
Optoelectronic package 光電套裝
Instrument table儀器工作臺
Customized 定制
Dust cover防塵罩
Customized 定制
User 's Manual用戶手冊
Sharpscope 3D special Sharpscope 3D專用
3.設(shè)備配置清單:
具體配置如下 |
1 | X2010 Coarse and Precise Focus Unit X2010基座和調(diào)焦系統(tǒng) | 1 | 套 | |
2 | 200x100mm Precise Stsge 精密載物臺 | 1 | 個 | |
3 | U-Bracket Mount LV U 型支架 | 1 | 個 | |
4 | LV-TI 3 Trinocular Eyepiece Tube 三目防靜電目鏡筒 | 1 | 套 | |
5 | Quadruple Nosepiece,For 5 sets of Objectives五孔鼻輪轉(zhuǎn)換器 | 1 | 套 | |
6 | Eyepiece CFI 10x10倍高清目鏡 | 1 | 對 | |
7 | 5W LED Point Ligte built-inTransformer for piscopic Illumination 5W LED上下光源 | 2 | 個 | |
8 | F-P Simple Polarizign Unit (For Episcopic Illumination) 偏光系統(tǒng) | 1 | 套 | |
9 | DIC Prism DIC微分干涉 | 1 | 套 | |
10 | Power Supply (220V) 上下光源控制器 | 1 | 個 | |
11 | .Photo Adapter 物鏡影象接口轉(zhuǎn)接環(huán) | 1 | 個 | |
12 | Axle counter 兩軸計數(shù)器 | 1 | 個 | |
13 | DS-Vil Color Camera Head 200萬像素CCD | 1 | 個 | |
14 | SOFTWARE 測量軟件 測量精度0.1um | 1 | 套 | |
15 | M Plan Apo HL 5X 5倍高分辨率物鏡 | 1 | 個 | |
16 | M Plan Apo HL 10X 10倍高分辨率物鏡 | 1 | 個 | |
17 | M Plan Apo HL 20X 20倍高分辨率物鏡 | 1 | 個 | |
18 | M Plan Apo HL 50X 50倍高分辨率物鏡 | 1 | 個 | |
19 | Computer monitor 19寸聯(lián)想顯示器 | 1 | 臺 | |
20 | DS Camera I/F Cable 20-26 攝像頭控制器連接線。 | 1 | 跟 | |
21 | USB A TO B CABLE USB數(shù)據(jù)線 | 1 | 跟 | |
22 | POWER CORD 電源線 | 3 | 跟 |
|
三.其他零配件Other spare parts
1.防塵罩1件 Dust-proof cover 1 piece
2.軟件使用說明書1本Software Instructions 1
3.用戶手冊1本User Manual 1
4. 環(huán)境要求Environmental requirements
(1)儀器放置的工作桌面需牢固、可靠、不得搖晃(由供應(yīng)商提供);The working table for the instrument should be firm, reliable and not shake (provided by the supplier);
(2)放置地點需遠(yuǎn)離各種震源(放置地點不會有影響,機(jī)器本身有防震墊,只要不是在震感十分明顯的震源附近,就沒有問題);The location should be far away from all kinds of seismic sources (the location will not affect, the machine itself has shock pads, as long as it is not near the source with obvious earthquake
(3)環(huán)境溫度保持在20℃~25℃,相對濕度≤75%;The ambient temperature is maintained at 20 ~25 C, and the relative humidity is less than 75%.
(4)放置環(huán)境應(yīng)該優(yōu)于無塵室標(biāo)準(zhǔn)Placement environment should be superior to the International Class 8 Dustproof Room Standard.;
(5)供電電源必須有電阻≤4Ω的接地保護(hù)The power supply must have grounding protection with resistance less than 4;
(6)設(shè)備需接220V±10%(AC) 50Hz 設(shè)備對水、氣沒有要求The equipment needs to be connected to 220V+10%(AC) 50Hz equipment, which has no requirement for water and gas.。
5.搬運、安裝措施Handling and Installation Measures
(1)我方負(fù)責(zé)將設(shè)備運送至客戶地方,并進(jìn)行安裝調(diào)試。客戶需負(fù)責(zé)提供必要的安裝及搬運所需。例如:地板叉、電動叉車、協(xié)助人員等We are responsible for transporting the equipment to the designated place of the customer and carrying out installation and debugging. Customers are responsible for providing necessary installation and handling requirements. For example: floor fork, electric forklift, assistant, etc.;
(2)須嚴(yán)格按照我方技術(shù)人員要求進(jìn)行操作,如有違規(guī)操作并因此產(chǎn)生的設(shè)備損壞(需更換配件的不包含在內(nèi))本公司負(fù)責(zé)維修,但不承擔(dān)任何責(zé)任Operations shall be carried out in strict accordance with the requirements of our technicians. In case of equipment damage caused by irregular operations (not included in the replacement parts), the company shall be responsible for maintenance, but shall not bear any responsibility;
(3)我方技術(shù)人員會在安裝過程中進(jìn)行儀器水平調(diào)節(jié)、軟件安裝調(diào)試、各類視訊卡安裝、安裝等操作Our technicians will adjust the level of instruments, install and debug software, install various video cards and install encrypted dogs during the installation process;
(4)我方技術(shù)人員會在裝機(jī)結(jié)束后進(jìn)行X軸、Y軸、Z軸校正,隨即結(jié)束安裝Our technicians will correct X-axis, Y-axis and Z-axis after installation, and then finish installation;
(5)設(shè)備安裝完成后,不可在未通知我方的情況下隨意搬動機(jī)臺After the installation of the equipment is completed, the platform shall not be moved at will without notice to us.。
6. 培訓(xùn)計劃及服務(wù)保證Training Program and Service Guarantee
(1)培訓(xùn)內(nèi)容Training content
了解設(shè)備各硬件名稱及功能Understand the hardware names and functions of the equipment;
常規(guī)使用注意事項Notes for routine use;
軟件功能及操作Software function and operation;
常見問題解決辦法Solutions to common problems.
(2)售后服務(wù)After-sales service
① 同版本軟件三年內(nèi)免費升級Free upgrade of the same version software within three years;
② 設(shè)備整機(jī)12個月超長保修,超出12個月的無需更換配件維修均為免費The equipment is guaranteed for 12 months, and the maintenance of spare parts without replacement is free for 12 months;
③ 關(guān)于本設(shè)備的任何問題,會在接到客戶來電的2小時內(nèi)給予回應(yīng)并在無法電話解決的情況下24小時內(nèi)到達(dá)現(xiàn)場Any questions about the equipment will be answered within 2 hours after receiving calls from customers and will arrive at the scene within 24 hours when the calls cannot be solved。
④ 若貴司使用人員發(fā)生更換,我們免費進(jìn)行新的操作培訓(xùn)If there is a change in your company's users, we will conduct new operation training free of charge。
7.售、購雙方責(zé)任Duties of both Sellers and Buyers
(1)我方負(fù)責(zé)設(shè)備的運送及安裝調(diào)試;購方負(fù)責(zé)設(shè)備搬入時必須的叉車等裝置We are responsible for the transportation, installation and commissioning of the equipment; the buyer is responsible for forklift trucks and other devices necessary for the equipment to be moved in;
(2)我方負(fù)責(zé)設(shè)備的使用及常見問題解決培訓(xùn);購方負(fù)責(zé)安排及約束使用人員進(jìn)行認(rèn)真聽講We are responsible for the use of equipment and training of common problem solving; the buyer is responsible for arranging and restraining the use of personnel to listen carefully;
(3)我方負(fù)責(zé)進(jìn)行售后服務(wù)及疑問解答;購方負(fù)責(zé)約束使用人員不可進(jìn)行違規(guī)操作We are responsible for after-sales service and question answering, and the buyer is responsible for restraining users from illegal operations;
(4)我方負(fù)責(zé)在三年內(nèi)進(jìn)行軟件免費升級(在有版本更新的情況下)We are responsible for free software upgrade within three years (with version updates).
8.權(quán)限確認(rèn)
If patent infringement occurs, Maker accepts full liability for any direct and indirect loss of customer. Additionally, in case of patent dispute, Maker guarantees continuous use (operation) of the system equipment provided by Maker.
如果發(fā)生侵權(quán)情況,供應(yīng)商承擔(dān)全部責(zé)任,并且客戶由此產(chǎn)生的直接和間接的損失也由供應(yīng)商承擔(dān)。此外,再糾紛的情況下,供應(yīng)商保證客戶可以繼續(xù)正常使用設(shè)備(系統(tǒng))。