德國(guó)SCHLODER 突發(fā)發(fā)生器
VIS 1700_1
♦ AC-Test: IEC / EN 61000-4-11
♦ DC-Test: IEC / EN 61000-4-29
♦ Inrush current measurement
at any phase position 0° - 360 °
♦ Automatic AC + DC ramp function
(fig.2), second voltage source not necessary
Introduction
德國(guó)SCHLODER 突發(fā)發(fā)生器
The clearly adjustable simulator VIS 1700 can simulate the voltage dips and voltage variations that can be
found on supply nets (AC and DC). Different modes of operation are possible:
Short interruptions : The supply network of the EUT can be interrupted in any phase position for
a defined time (0,1 ms – 9980 ms).
Voltage dips: The switching between the rated voltage U1 and the variable voltage U2 (U2
always <= U1) is always erratic. It can be set at each phase angle of the mains
begin or end. The standard test is defined at 40%, 70% and 80%. This test requires
the injection of the same phase voltage U2 at the rear of the device. A
step transformer (VIS 740) fulfilled the standard requirement. Fig. 1
Voltage fluctuation: Fluctuation to an adjustable voltage (0 95 % of U1). The parameters for release
time (0,1 – 70 sec.), test time (0,01 – 70 sec.) and recovery time (0,1 –
70 sec.) can be set individually. This is not an additional supply voltage required.
Fig. 2
Inrush current: For each EUT up to max. 16 A rated current (AC) can be measured the inrush
current on any phase position (0 – 360°).
For oscilloscope analysis there are three BNC jacks on the back side of the unit to examine the parameters
voltage, current and trigger.
Standard requirements
Fig.1: Voltage dips Fig.2: Voltage fluctuation
technical data may be changed without notice
151102
S c h l ö d e r G m b H
Hauptstr. 71, D - 75210 Keltern-Weiler
? +49-7236/ 9396-0 • ? +49-07236/ 9396-90
: info@schloeder-emv.de
Internet: www.schloeder-emv.de
Technical data
EUT supply
♦ Nominal voltage AC max. 280 V
DC max. 3 6 0 V
♦ Nominal current
Voltage dips (fig. 1)
AC max. 16 A,
DC max. 8 A
Voltage fluctuation (fig. 2)
AC max. 16 A
DC max. 4 A
♦ Phase indication [2] lamp red / green
Functions:
[9] Interruptions / voltage variations - synchronous
and asynchronous
[3] Supply voltage U1 = UN : reversing to
+10% UN and -10% UN
[5] Display supply voltage U1
[4] Variable voltage U2 test and U2 on, activation
of the >automatic ramp function< (fig. 2)
[6] Display variable voltage U2
[1] EUT on / off
[18] Starting inrush current Imax / rated current
measurement
[10] Inverse operation within one period
[11] Switch for remote control release
[12] RS 232-interface
[13] Adjustment for phase angle [7], duration [8],
period [14] and test time [15] with digital
potentiometer
[22] MEMORY key
Functions:
[7] Phase angle 0 - 359°, step 1°
[8] Duration t1 0,1ms - 9980ms
[14] Period t2 Asynchronous 5,0ms -9990ms
Synchronous 20ms - 9980ms
[15] Test time 0,1sec - 9990sec, furthermore
single event and
continuous operation
[16] Trigger Start- and Stop-key
[17] Trigger external BNC connector
[19] EUT connection Protection earth outlet
[20] Additional lab. jacks
[21] Ground connection Ground jack at the
front side and back side
♦ Measurement BNC outputs (on rear)
for voltage, current and
scope triggering
♦ EUT supply "U1" On rear
♦ EUT supply "U2" On rear (e.g.variac)
♦ EUT Fail Trigger-input, on rear
Common
♦ Operation temp. 0 - 40 °C
♦ Dimensions 19″ housing, 3 HE
♦ Weight 13 kg
♦ Power supply 230V / 50 Hz, 80VA,
Options:
♦ VIS 740 Step transformer 16,0 A
For voltage fluctuation, fig.2
































买车|
游戏|
广昌县|
来安县|
马公市|
六枝特区|
五莲县|
乌海市|
通化县|
屏南县|
望江县|
高州市|
文昌市|
中山市|
万源市|
余干县|
周至县|
兴宁市|
治多县|
柳林县|
金昌市|
锡林郭勒盟|
吕梁市|
东兴市|
宜兰市|
南漳县|
南漳县|
琼结县|
仲巴县|
聂拉木县|
和硕县|
金山区|
潮州市|
石台县|
邵阳市|
海丰县|
金门县|
项城市|
颍上县|
壶关县|
宽城|